Business
Civil Engineering and Infrastructure Construction
Project Type
Roads
Country
Serbia
City
Gostun-Brodarevo
Contractor
Putevi Užice
Status
Under construction
The works are being carried out by the company PUTEVI AD Užice, with the completion of all rough works scheduled by the end of the current year. The total value of the works is 200 million dinars. The investor is JP “Putevi Srbije.”
Works on two galleries located directly at the tunnel entrance/exit have been completed. The concrete structure has been executed on all four galleries. Installation works for 32 piles, each 16 meters long, have been completed, and all 75 assembly elements have been mounted, each weighing approximately 25 tons per support.
Purpose - Slope stabilization works
Section - Gostun - Brodarevo
Investor - JP "Putevi Srbije" Belgrade
Investment value - 200,000,000.00 RSD
Completion of works -
Section length - 172 m
Asfalt -
Beton -
Tampon sloj -
Nasip -
Iskop -
Ograde -
Gostun-Brodarevo